November 3, 2010

Tilt up concrete panels

Filed under: Uncategorized — Tags: , , , , — admin @ 7:39 pm

Several terms – tilt-up panel construction, tiltwall construction, precast concrete building construction – are used to reference new or nontraditional cement building processes. Do they all mean the same thing? If not, what are the differences?

As previously stated in this article, tilt-up and tiltwall are two terms used to describe the same process. For a tilt-up concrete building, the walls are created by assembling forms and pouring large slabs of cement called panels directly at the job site. The cement panels are then tilted up into position around the building’s slab to form the walls. Because the concrete tiltwall forms are assembled and poured directly at the job site, no transportation of panels is required. One major benefit of this is that the size of the panels is limited only by the needs of the building and the strength of the concrete panels themselves.

Tilt-up construction panels can sometimes be extremely wide and/or tall. Tilt-up concrete panels have been measured at just over 69 feet across and almost 93 feet from top to bottom. Thus, architects and tilt-up concrete contractors have a great deal of flexibility in planning and creating their buildings.

Because concrete tilt-up walls are poured outdoors, contractors are at the mercy of climatic conditions. When temperatures drop below freezing, curing the concrete panels becomes more difficult and expensive. This is why tilt-up concrete construction is particularly popular in southern parts of the United States, where cold weather occurs less frequently. Certainly, tilt-up concrete buildings are built in northern areas, but the window of time for temperate weather is much smaller and less predictable, which can make construction schedules more difficult to meet.

The precast concrete building process is similar to tilt-up construction, but it addresses the challenges presented by weather. For precast concrete buildings, work crews do not set up forms at the job site to create the panels. Instead, workers pre cast concrete panels at a large manufacturing facility. Because the precast concrete forms are poured indoors, this activity can take place regardless the weather conditions. After curing, the precast concrete panels are trucked to the job site. From this point, precast concrete buildings are assembled in much the same manner as tiltwall buildings.

The fact that precast concrete walls are formed at a manufacturing facility resolves the weather issue, but presents a different limitation not found in tilt-up construction. Because the panels must be transported – sometimes over long distances – places a substantial limitation on how wide or tall each panel can be. It would be impossible to load precast panels that were 60 feet wide or 90 feet long onto trucks and transport them any distance. For a precast construction project, the panels must be smaller and more manageable to allow trucks to haul them over the road to their final destination. This places greater design restrictions on architects and limits the applications where precast construction can be used.

Clearly, tilt-up concrete construction and precast concrete are similar processes. Because tilt-up affords more flexibility, it is the method of choice in locations where the weather allows it. Precast concrete is a suitable choice in circumstances where environmental factors and the construction schedule preclude tilt-up as a viable option.

September 10, 2010

Sheetpile Resources

Filed under: Uncategorized — Tags: , , , , — admin @ 9:10 am

A good link for sheet pile information and design criteria.

Sheet piling consists of a series of panels with interlocking connections, driven into the ground with impact or vibratory hammers to form an impermeable barrier. Sheets can be made from a variety of materials such as steel, vinyl, plastic, wood, recast concrete and, fiberglass. Sheet piling has been a proved technology within the construction industry for years. The most recent addition was the vinyl sheets introduced in 1989. These vinyl sheets, with imperious sealants, have made this a very attractive technology for the cutoff or containment of contaminated groundwater flow in the environmental industry.

August 11, 2010

Tax ‘Extenders’ Bill Blocked Again in Senate

Filed under: Uncategorized — Tags: , , , — admin @ 11:49 am

Senate Republicans–and one Democrat–again have blocked a package of extensions of tax incentives, including some that construction industry groups support. Democrats’ failure to win a procedural vote on June 24 sends the drafters of the bill back to the drawing board.

« Newer PostsOlder Posts »

Quick Facts on Shortlister

  • Service launched November 22, 2008
  • Member participation growing daily - check back often
  • Project leads are being posted in nearly every state
  • 100% Free
  • Manage everything from your Account Manager

Post your project today in order to receive bids. Simply fill out a form describing your project and upload any relevant documents. Start receiving bids from service professionals today.

Search construction projects out for bid in your area by utilizing our search tool. Perform a simple search by zip code or state or refine your search. After reviewing matching projects, bid on desired opportunities.